Early-on we decided to go with a crane with a rotating boom as we thought this would be the most efficient and practical way of transporting the load.
However to achieve this the length of the boom would need to be at-least 2m to transfer the load 4m from the point of lift. We realised that a 2m beam would be too heavy and large to transport.
To overcome this problem we split the beam into two half's of 1.1m and 1.2m respectively. These two beams would be joined together using this part:-


Each beams will be connected to the I-beam connector by 5 M16 hex bolts, hence insuring structural stability while solving the problem of making the crane portable.

Another feature of the design is hinged leg joints:-

This part of the design allows the crane to be stable while on uneven terrain by adjusting the height of the feet.
This part will be connected to the feet which will clamp to the floor to give the crane a more rigid feel. The feet will be interchangeable so according to the terrain the correct feet can be used.


Here is what the finished crane looks like:-



Detailed Drawings of Each Part

1.1m Beam

1.2m Beam

Center Console

Feet-Leg Connector

I-Beam Connection

Large Leg

Large Leg Connector

Small Leg

Small Leg Connector
Assembly Drawing with Bill of Materials
(not sure why the pictures are not click-able e-mail me at razaqa@aston.ac.uk if you require better pictures)
(Asrar)

Manufacture and Fitness for Purpose

After extensive researching and brainstorming with the group meeting we decided to use an I-Beam instead of a solid Block or T-Beam.
Reasons
  1. An I-Beam is generally used for construction and heavy weight lifting purposes this is because it is more stable and deflects less than the T-beam and has a significant amount of weight less than a Solid Block.
  2. If the amount of material used to produce a I-Beam is less obviously the amount of material used would be less thus reducing the final cost of the product.
After this decision and extensive research on different materials their densities and Young’s modulus calculations were done to calculate the maximum deflection a beam would be able to withstand and the amount our beam would deflect under the maximum load specified. These values came up to be at about 9.28*10^-3m the maximum deflection and 4.2*10^-3m which was the deflection the I-beam would have under the maximum load. This proved that the choice of material, which was carbon steel and length is appropriate so the beam will not fail under maximum conditions.
Calculations were also done to calculate the maximum compression on the centre part which came up to about 960KN and then we did some calculations to calculate the compression which it will undergo under the maximum load. We added another 4000Kg in the calculation just to be sure. So the end result was that the maximum compressive force that the centre piece made up of aluminium alloy can withstand is 960KN and the compressive force with 5000Kg would be 50KN which is considerably less than the earlier value and this is under much more weight than the required amount. So this proves that the material used in the centre part is appropriate and it will not fail under maximum conditions.
(Zaeem)

Finance


Component Mass Material Quantity Cost
Hand Winch

1 £90.95
Pulley

1 £7.64
Wire Rope

1 £32.90
M8 Bolts

100 £5.61
M8 Nuts

100 £2.21
M8 Washers

100 £0.90
M16 Bolts

50 £17.99
M16 Nuts

100 £12.95
M16 Washers

100 £4.87
Boom 117Kg Carbon steel 1 £52.61
Centre console 98.018Kg Aluminium 1 £148.28
Large leg connector 24.621Kg Aluminium 1 £37.25
Small leg connector 10.327Kg Aluminium 1 £15.62
Feet 5.85Kg Aluminium 3 £26.55
Small leg 2.757Kg Aluminium 3 £12.51
Large leg 3.848Kg Aluminium 3 £17.46
I-Beam connection 2.104Kg Carbon steel 1 £0.95

The total cost of our crane = £487.25 (excluding manufacturing and labour costs)
(Daljinder)

Conclusion

We have not as yet received accurate costs from manufactures of the cost of labour and manufacture but many companies have quoted us a price in the region of £300.

This will bring the total cost of the crane to £787.25; we will be looking for a unit retail price of £1000 with a 10% discount for buys over 100 cranes.

We think this is a very competitive price and you can be rest assured the quality of our product will be second to none, we are very proud of the reputation our company has achieved over the years and will not let you down.

We look forward to your reply

(Hani)

Wednesday, 28 April 2010

Calculation of Mass and volume of parts



The density of the materials chosen is:
Material Density
Carbon steel 7850 Kg/m3
Aluminium 2600 Kg/m3


By multiplying the density by the volume the mass is obtained:

Component Volume Mass Material
Centre console 0.03770m³ 98.018Kg Aluminium
Large leg connector 0.00947m³ 24.621Kg Aluminium
Small leg connector 0.00397m³ 10.327Kg Aluminium
Feet 0.00225m³ 5.85Kg Aluminium
Small leg 0.00106m³ 2.757Kg Aluminium
Large leg 0.00148m³ 3.848Kg Aluminium
I-Beam connection 0.000268m³ 2.104Kg Carbon steel
1.1m Beam 0.00715m³ 56Kg Carbon steel
1.2m Beam 0.0078m³ 61Kg Carbon steel


The total mass of our crane with every component connected and with 3xFeet, 3xSmall leg and 3xLarge leg is:

289.435Kg

Friday, 23 April 2010

Cost of Bolts, Nuts and Washers

It was found that the M16 and M8 bolts are strong enough to be used for our crane.
We will be using M16 x 45mm bolts and M8 x 30mm bolts with washers and nuts.

Cost of pack of 50 M16 x 50mm bolt = £17.99
Cost of pack of 100 M16 x Hex nuts = £12.95
Cost of pack of 100 M16 x Flat washers = £4.87

Cost of pack of 100 M8 x 50mm bolt = £5.61
Cost of pack of 100 M8 x Hex nuts = £2.21
Cost of pack of 100 M8 x Flat washers = £0.90


http://www.namrick.co.uk/

Thursday, 22 April 2010

Cost of Hand winch, Pulley and Wire rope

The crane requires 1 hand winch, 1 pulley and the wire rope attached to hand winch and load. It is decided the following are to be used:

The BHW-2600 G Delta Hand Winch
- able to lift 1200Kg
- can store 13m of rope
- suitabe for rope with 8mm diameter

Cost of hand winch = £90.95


Cast Iron Pulley
- stable for wire ropes 8mm to 25mm diameter

Cost of pulley = £7.64


8mm diameter Winch Rope
- 8mm diameter
- 15m length

Cost of wire rope = £32.90

TOTAL = £131.49


http://www.dlhonline.co.uk/delta-galvanised-lifting-winch-1351-p.asp
http://www.dlhonline.co.uk/cast-iron-pulleys-with-bronze-bush-634-p.asp
http://www.dlhonline.co.uk/8-mm-dia-winch-ropes-standard-length-15-metres-616-p.asp

Friday, 26 March 2010

Top half of Crane - Design sketches

An initial design of the top half of the crane.

A hydraulic piston is used to adjust the height of the crane. Maybe one is not needed and the height of the crane could be fixed.

The boom is made of two components where the thinner one can slot back into the larger component, this allows portability.

A hand winch is used to control the cable.



Simple design of the top half of the crane.

A support for the beam adds extra stability and strength to the boom.

Hand winch used to adjust cable length.

Sunday, 21 March 2010

Initial Design


After sitting together and brainstorming on the different types of cranes. We concluded with the following design. The type 3 crane.

Our reasoning was that it would be more practical given the situation. It can be broken into smaller parts to fit into a 4 by 4. It can be made so that the feet provide stability even on an uneven ground. If designed properly it would carry over 1000 kg.

After drawing a simple sketch of the design the green light was given. We decided to split into two groups to fasten the process. Group one will design the top half and group two will design the bottom half. there will be an overlapping section between the two groups when connected the two parts together.

From here on each group will further its research and designs.

Brainstorming




Thursday, 4 March 2010

Testing

These are the respected roles assigned to group members


Hani Saleh
Project Manager
Daljinder sandhu
Finance Officer
Hani/Asrar/Zaeem/Dal
Chief Designer
Asrar Razaq
Stress Analyst
Zaeem Rana
Materials Specialist